Opening Up

The second floor is really starting to open up after we expanded the doorway from the hallway and removed the wall between the old bedrooms in the back. We hired professionals who within a single day (and a crew of 5) did what would have taken us an entire month or more to pull off. New beams were put in to support the load of the third floor and things are really starting to come together.